九游会J9·[china]官方网站-真人游戏第一品牌

Location:Home > detail
Section III of Guangzhou-Shenzhen-Hong Kong Railway
Source:CREC Date:2018年11月27日

With a total length of 7.328 kilometers, the project is located at Shenzhen, Guangdong Province. It started in 2008 and opened to traffic in December, 2010. It mainly includes 3.578-kilometer-long roadbed, six bridges with a total length of 1,914.17 meters (two grand bridges with a total length of 1,593.67 meters and four medium bridge with a total length of 320.5 meters), eleven culverts with a total length of 697.58 meters, two tunnels with a total length of 762.97 meters and one railway station whose building area is 182,074 square meters. It won the Luban Prize for Construction Project in 2012. 

Section III of Guangzhou-Shenzhen-Hong Kong Railway

 

Print Close