As the first electrified railway built in China, the project started in 1952 and has a total length of approximately 668 kilometers. CREC is responsible for providing about 68% (by length) of survey and design services.
Baoji-Chengdu Railway
Print Close
China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Privacy Policy
Copyright