Double-line Track from Tongi to Bhairab Bazar including Signalling on Dhaka-Chittagong Main Line, Bangladesh
Source:MBEC Date:2019年03月15日

It is a second-line railway project for existing railways. The length of the line is 64.255km and the total length of the bridge is 2.415km. There are 40 new bridges in this package, and 9 of them are steel girder bridges. The steel girder bridges contain three different span lengths (77.02 m, 32.4 m and 19.53m). It was commenced in September 2011 and completed in November 2014.

Double-line Track from Tongi to Bhairab Bazar including Signalling on Dhaka-Chittagong Main Line