九游会J9·[china]官方网站-真人游戏第一品牌

Location:Home > detail
Location: Home > News Update > News Update
Shuangliu Yangtze River Bridge's South Main Tower on the Xingang Expressway Successfully Completed
Source: Date:2024年06月26日

新港高速公路双柳长江大桥南主塔成功封顶1

On May 24, the south main tower of Shuangliu Yangtze River Bridge on Xingang Expressway, designed by China Railway Major Bridge Reconnaissance & Design Institute and constructed by China Railway Major Bridge Engineering Group, was successfully capped. 

Shuangliu Yangtze River Bridge of Xingang Expressway and its connection project are an integral part of the ring line of the Wuhan metropolitan area. With a total length of 35.043 kilometers and a design speed of 120 kilometers per hour, the main bridge is a double-tower, single-span steel box girder suspension bridge with a main span of 1430 meters. The north bank of the bridge is located in Xinzhou District of Wuhan City, and the south bank is located in Huarong District of Ezhou City.

Print Close