九游会J9·[china]官方网站-真人游戏第一品牌

Location:Home > detail
Location: Home > News Update > News Update
Canada Paltrow Bridge Levers All Delivered and Shipped
Source: Date:2024年07月12日

   加拿大帕特洛桥杆件全部交付发运1

On June 29, the last ship of the steel structural lever of the Canadian Paltrow Bridge manufactured by China Railway Hi-Tech Industry was successfully shipped, marking the successful completion of the project manufacturing.

Canada's Paltrow Bridge is manufactured according to Canadian and American standards, and the China Railway Hi-Tech Industry is responsible for the manufacture, painting, and shipment of steel components of the bridge. In the manufacturing process, China Railway Hi-Tech Industry strictly follows the 100% self-inspection of the whole bridge weld, the 100% re-inspection of the general contractor's supervision, and the 100% trial assembly of the entire bridge in the factory, and adopts the phased array ultrasonic imaging detection technology. Canadian owners and general contractors affirm high-quality products and sincere service.

The total length of the Paltrow Bridge in Canada is about 1530 meters, the total weight of the steel component project is about 14635 tons, and eight ships are shipped to Vancouver, Canada. The construction of the central tower in Canada has been completed, making it the highest bridge tower in British Columbia, Canada.

Print Close