九游会J9·[china]官方网站-真人游戏第一品牌

Location: Home > News Update > News Update
OCS for Power Supply of China-Laos Railway Commissioned
Source: Date:2021年11月08日

Anthem of CREC—“Trailbreaker”

  On November 1, three traction substations successfully transmitted electricity to the overhead contact system (OCS) for the section between Ganlanba and Mohan in southwest China's Yunnan Province along the China-Laos Railway, and a power-on running test was also finished. The electricity project was mainly undertaken by China Railway Wuhan Electrification Engineering Group Co., Ltd. (WEEG). Thus, all wirings, the OCS and the supporting equipment have been completed and accepted after inspections, creating a favorable condition for following dynamic detection.

  WEEG staff celebrate the successful power transmission for the China-Laos Railway

  WEEG staff celebrate the successful power transmission for the China-Laos Railway. 

  The China-Laos Railway connects Kunming in China's Yunnan Province in the north with Vientiane, capital of Laos, in the south, stretching more than 1,000 kilometers in length. After completion, it will end the history in which Pu’er City and Xishuangbanna Dai Autonomous Prefecture have no access to rail transportation. Passengers can travel between Kunming and Vientiane within a day.

  The overhead contact system in operation.

  The overhead contact system in operation.

Print Close

九游会J9·[china]官方网站-真人游戏第一品牌

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: //dl-ks.com/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved